Electrical CoC Inspection Checklist for South African Electricians

Professional South African Electrical CoC Inspection Checklist • SANS 10142-1 Aligned

Electrical CoC Inspection Checklist for South African Electricians

As a South African electrician issuing a Certificate of Compliance (CoC), your inspection should be based on the latest applicable SANS 10142-1 requirements and the Electrical Installation Regulations. This checklist is intended as a practical field guide to help identify visible defects, confirm protection and earthing, and record the required test results before completing the CoC.

Important: This checklist does not replace the latest SANS 10142-1, the Electrical Installation Regulations, or your responsibility as the Registered Person.

1. General Inspection

  • ☐ Supply authority seal intact, where applicable
  • ☐ Installation appears safe and free from visible defects
  • ☐ No exposed live conductors
  • ☐ Correct voltage supply
  • ☐ Main switch accessible and correctly rated
  • ☐ Installation adequately protected against mechanical damage
  • ☐ Warning labels present where required
  • ☐ No signs of overheating or burning

2. Distribution Board (DB)

  • ☐ DB cover fitted and secure
  • ☐ All openings sealed
  • ☐ Main switch identified
  • ☐ Circuit breakers correctly rated
  • ☐ Circuit breakers securely mounted
  • ☐ Neutral bar correctly installed
  • ☐ Earth bar correctly installed
  • ☐ No double lugging unless manufacturer permits
  • ☐ Circuits clearly labelled
  • ☐ Legend schedule completed
  • ☐ Surge protection installed where required
  • ☐ Earth leakage protection installed
  • ☐ Earth leakage test button functional

3. Earthing and Bonding

  • ☐ Main earth conductor present
  • ☐ Earth electrode connection secure
  • ☐ Earth continuity conductor correctly sized
  • ☐ Water pipes bonded
  • ☐ Metal waste pipes bonded where required
  • ☐ Structural steel bonded where applicable
  • ☐ Geyser bonded
  • ☐ All exposed conductive parts earthed
  • ☐ Earth continuity verified throughout installation

4. Socket Outlets

  • ☐ Socket outlets securely mounted
  • ☐ Correct polarity
  • ☐ Earth present and connected
  • ☐ No cracked or damaged sockets
  • ☐ Socket height compliant where applicable
  • ☐ Weatherproof sockets installed outdoors
  • ☐ Socket circuits correctly protected

5. Lighting Circuits

  • ☐ Light fittings secure
  • ☐ No exposed live parts
  • ☐ Correct switching arrangement
  • ☐ Metal fittings earthed
  • ☐ Ceiling roses and junction boxes fitted correctly
  • ☐ Outdoor lighting suitably rated

6. Geyser Installation

  • ☐ Isolator within required distance
  • ☐ Isolator correctly labelled
  • ☐ Earth continuity present
  • ☐ Bonding completed
  • ☐ Wiring correctly sized
  • ☐ Drip tray installed, where required
  • ☐ Thermostat and element cover fitted

7. Stove and Oven Circuits

  • ☐ Dedicated circuit installed
  • ☐ Correct cable size
  • ☐ Isolator accessible
  • ☐ Earth continuity verified
  • ☐ Protection device correctly rated

8. Fixed Appliances

  • ☐ Air conditioners correctly isolated
  • ☐ Pool pumps correctly isolated
  • ☐ Gate motors safely supplied
  • ☐ Borehole pumps protected
  • ☐ Appliances earthed

9. Outdoor Installations

  • ☐ Weatherproof enclosures used
  • ☐ Correct IP rating
  • ☐ Outdoor wiring protected
  • ☐ Garden lighting safe
  • ☐ Pool installations comply with regulations

10. Mandatory Test Results

These tests form part of the inspection and test report required before issuing a CoC.

Continuity

  • ☐ Earth continuity conductors tested
  • ☐ Bonding continuity tested

Insulation Resistance

  • ☐ Line to Neutral tested
  • ☐ Line to Earth tested
  • ☐ Neutral to Earth tested

Polarity

  • ☐ Polarity verified at all points

Earth Leakage

  • ☐ Trip operation verified
  • ☐ Trip time acceptable

Earth Loop Impedance

  • ☐ Measured where required
  • ☐ Fault protection verified

Voltage and Fault Current

  • ☐ Supply voltage recorded
  • ☐ Prospective short-circuit current measured or calculated
  • ☐ Earth electrode resistance recorded where applicable

Common Reasons Properties Fail a CoC

  • ☐ Unlabelled DB board
  • ☐ No earth leakage protection
  • ☐ Missing earth conductors
  • ☐ Open joints in roof spaces
  • ☐ Incorrect geyser isolators
  • ☐ Socket outlets with reverse polarity
  • ☐ Broken light fittings
  • ☐ Missing bonding on water pipes or geysers
  • ☐ Undersized conductors
  • ☐ Damaged extension wiring used as fixed wiring
  • ☐ Non-compliant solar or inverter connections

Final Documentation

  • ☐ Complete inspection report
  • ☐ Complete test report
  • ☐ Record all DB test results
  • ☐ Record earth continuity values
  • ☐ Record insulation resistance values
  • ☐ Complete CoC form
  • ☐ Attach supplementary test sheets if required
  • ☐ Sign and date as Registered Person